PRESIDENCY OF THE DR CONGO

//PRESIDENCY OF THE DR CONGO

Category:

Client: Office of the President of the Republic

Date: 2019

Estimation: Us$ 25.000.000

Kinshasa, DR CONGO Year: 2019-
Budget: Us$ 25.000.000

In 2019, Axcess-Congo was asked by the Director of the Office of the President of the Republic to evaluate the creation of offices for the Presidency of the Democratic Republic of Congo in an emblematic and historic building, in the spirit of its original design.

This included modernising the technical installations, bringing them up to international standards and meeting the security criteria linked to the quality and function of the Presidency. Pa, BEEBE)