SOGEPI

Category:

Client: Embassy District

Date: 2014

Estimation: US$ 9.000.000

Kinshasa, DR CONGO

Year: 2014
Project cost: US$ 9.000.000

Located in the Embassy District on a residential street in the centre of Gombe, our project involves the design of a high standard residential building on a 3,400mz2 site. The result will be a building with 8 storeys above ground and 2 basements.

The crowning glory of the building will be two duplex penthouse apartments with infinity pools. Total built up area: 5,200 m2